Mar 012023
 

Spot repairs of the trough of the old Claflin Street culvert took place in February 2023. The project includes the removal of the old grate system and replacement by a newly engineered grate with a larger mouth. The new grate is similar to the one behind the library and is designed to accommodate debris and greater precipitation. The new culvert will contain and direct higher water levels without limiting the flow. – Editor

Photos: Radha Iyengar

Share

Sorry, the comment form is closed at this time.